apsware visualjob for Control-M

Release Notes apsware visualjob 9.8.5 for Control-M

apsware visualjob for IWS and Control-M

apsware visualjob 9.8.5 for Control-M

apsware would like to inform you about the general availability of visualjob for Control-M 9.8.5.

We have enhanced the functionality of visualjob for Control-M in the following areas.

  • Improved: The ‘ApsDashboardVjMode for Control-M Administration tool’ contains two new advanced functions; ‘Check Settings for selected OrderID(s)’ and ‘Show Event Log’.
  • Fixed: Critical Path on Demand: Complete status not set. (Issue limited to non-english SQL Server installations.)
  • Fixed: non-import of Smart Folder Data as Group Scheduling information. (Issue only occurred with Control-M for Distributed Systems running Control-M v.8 or 9.)
  • Fixed: Critical Path shows incomplete result if the Folder name specified in a Job does not equal the Sub-Application name.

We recommend upgrading to this new version as soon as possible.

Note: If you are running Control-M version 8 or 9 on distributed systems (non z/OS) and you are using Group Scheduling / Smart Folders, please re-import all available CTMLOGs (DBparser not required) via visualstatman for Control-M SQL Server. If you are not performing this re-import, statistical data for Group Entities / Smart Folders may be incomplete.

apsware visual job for Control-M 9.8.5, including software and documentation, is available from the
If you do not have access to the download area or if you have any other questions, please